{"id":26717,"date":"2026-10-21T09:00:00","date_gmt":"2026-10-21T09:00:00","guid":{"rendered":"https:\/\/evaluationshub.com\/?p=26717"},"modified":"2026-09-29T15:42:22","modified_gmt":"2026-09-29T15:42:22","slug":"collect-once-report-many-supplier-data-csrd-eudr-cbam","status":"publish","type":"post","link":"https:\/\/evaluationshub.com\/collect-once-report-many-supplier-data-csrd-eudr-cbam\/","title":{"rendered":"Collect Once, Report Many Times: A Supplier Data Map for CSRD, CSDDD, EUDR and CBAM","gt_translate_keys":[{"key":"rendered","format":"text"}]},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Start with one question<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Here is a question your team already asks suppliers: <strong>where was this made?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Seven words. One field in a form. It looks like the easiest thing you will collect all year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Now watch what happens when four different colleagues ask it in the same quarter.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The sustainability team asks it because the CSRD value chain disclosures need to know where the impacts sit. They want a country, and they will accept an estimate if the supplier cannot give better.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The customs team asks it because CBAM needs the identity of the <strong>installation<\/strong> where the goods were produced, along with the embedded emissions and the production route. A country is worthless to them. They need the plant, and they need it tied to the specific consignment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The sourcing team asks it because the EU Deforestation Regulation needs the geolocation of every plot of land where the commodity was produced. Not the plant. The land.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The legal team asks it because if an authority sends a request under the Forced Labour Regulation, that request will name a <strong>product<\/strong>, and someone will have thirty working days to say which sites made it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Same seven words. Four incompatible answers. And in most organisations, four separate emails to the same supplier, in the same quarter, from four people who have never met.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This piece is about fixing that, and about the one design decision that makes the difference: <strong>treat the purpose of a question as part of the data, not as context that lives in someone&#8217;s inbox.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why the obvious fix does not work<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The obvious fix is a master questionnaire. One long form, sent once a year, containing everything anybody might need.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It fails for a reason that is now written into EU law rather than merely into supplier patience.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the reworked sustainability rules, the Commission introduced what it calls the <strong>value chain cap<\/strong>. Its own explanatory note is direct about what it does: the cap &#8220;prohibits CSRD companies from requiring companies in their value chain that have 1000 employees or fewer, to provide more sustainability information than the content of the sustainability reporting standard for voluntary use.&#8221; Companies with ten employees or fewer get additional protection on top.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">So the master questionnaire is not just unpopular. For the great majority of your supply base, large parts of it are no longer something you can require.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But read the next sentence in the same note, because this is where the design problem becomes interesting:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n\n<p class=\"wp-block-paragraph\">&#8220;The value chain cap applies only in the context of fulfilling CSRD reporting obligations and does not affect information requests for purposes other than sustainability reporting under CSRD.&#8221;<\/p>\n\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">That single sentence is the most useful thing published about supplier data collection this year, and almost nobody is talking about it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It means the limit does not attach to the question. It attaches to the <strong>reason you are asking it.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The identical field, requested from the identical supplier on the identical day, is capped when you are collecting it for CSRD and uncapped when you are collecting it because EUDR requires it to place goods on the market. One is a reporting obligation with a burden-sharing rule attached. The other is a condition of market access with no such rule.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Which means a supplier data set that records only <em>what<\/em> you asked can no longer tell you whether you were entitled to ask it. You need to record <em>why<\/em>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Purpose as a first-class field<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Most supplier information systems store a question, an answer, a date and an owner. Add one more column: <strong>the purpose, or purposes, this field serves.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It sounds like documentation overhead. It is actually the thing that makes everything downstream possible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With purpose recorded against every field you can answer, instantly and without a meeting:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n\n<li>Which questions in this year&#8217;s campaign are we entitled to require from a supplier with eighty employees, and which are we asking as a favour<\/li>\n\n\n<li>If a supplier declines a field, which report loses what<\/li>\n\n\n<li>When a new regime arrives, which of its data points do we already hold, and which are genuinely new<\/li>\n\n\n<li>Which single question is carrying the most weight, and therefore deserves the most care in its wording<\/li>\n\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Without it, every one of those questions becomes a research project, every time. This is the same argument that makes a proper <a href=\"https:\/\/evaluationshub.com\/supplier-information-management-sim-strong-in-evaluationshub\/\">supplier information management layer<\/a> worth more than a folder of completed forms, and it is the practical half of <a href=\"https:\/\/evaluationshub.com\/supplier-master-data-governance\/\">supplier master data governance<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The four axes that decide whether an answer travels<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">An answer collected for one purpose is reusable for another only if it matches on four axes. Check these before you assume reuse.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>1. What the data attaches to.<\/strong> This is the one that quietly destroys most reuse attempts. Regimes attach their demands to different objects, and an answer attached to the wrong object cannot be converted upwards.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>2. The evidence standard.<\/strong> A self-declared answer and a third-party verified answer are different data, even when the words are identical.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>3. Who you may ask, and under what limit.<\/strong> The caps differ by regime, and they differ in shape, not just in threshold.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>4. The refresh clock.<\/strong> A field that is true annually and a field that must be true per consignment cannot share a collection cycle.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Here is how the main regimes sit against those axes.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead>\n<tr>\n<th>Regime<\/th>\n<th>Attaches to<\/th>\n<th>Typical evidence standard<\/th>\n<th>Limit on what you can require<\/th>\n<th>Refresh rhythm<\/th>\n<\/tr>\n<\/thead><tbody>\n<tr>\n<td>CSRD value chain disclosure<\/td>\n<td>Entity, often country level<\/td>\n<td>Reported data, estimates and sector averages accepted where better data is unavailable<\/td>\n<td>Value chain cap: suppliers with 1,000 employees or fewer cannot be required to give more than the voluntary standard contains<\/td>\n<td>Annual reporting cycle<\/td>\n<\/tr>\n<tr>\n<td>CSDDD<\/td>\n<td>Entity and relationship, covering direct and indirect business partners<\/td>\n<td>Risk-based, proportionate to severity and likelihood<\/td>\n<td>Requests must be necessary; for partners with fewer than 5,000 employees, information should only be requested where it cannot reasonably be obtained by other means<\/td>\n<td>Periodic, risk-driven<\/td>\n<\/tr>\n<tr>\n<td>EUDR<\/td>\n<td>Plot of land, and the consignment placed on the market<\/td>\n<td>Geolocation of every plot, supported by a due diligence statement<\/td>\n<td>No size-based cap. The data is a condition of placing goods on the market<\/td>\n<td>Per consignment, with the underlying plot data reused across consignments<\/td>\n<\/tr>\n<tr>\n<td>CBAM<\/td>\n<td>Installation, and the imported consignment<\/td>\n<td>Installation identification, embedded direct and indirect emissions, production route<\/td>\n<td>Applies above a single mass-based threshold of 50 tonnes of CBAM goods per importer per year<\/td>\n<td>Annual declaration, built from consignment-level data<\/td>\n<\/tr>\n<tr>\n<td>EU Forced Labour Regulation<\/td>\n<td>Product, traced back to sites<\/td>\n<td>Whatever you can produce on request. There is no prescribed dataset and no due diligence obligation<\/td>\n<td>No routine collection obligation at all. The demand arrives as a request from an authority<\/td>\n<td>On request, with a short response window<\/td>\n<\/tr>\n<\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Two things fall straight out of that table.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Country of origin is the least reusable field you collect.<\/strong> It satisfies the loosest requirement and converts upward into nothing. The plant, the plot and the part number all convert downward into a country whenever you need one. This is the case for building the <a href=\"https:\/\/evaluationshub.com\/procurement-data-management-supplier-master-data-governance\/\">supplier, site and part layer<\/a> rather than a flat vendor list, and it is why <a href=\"https:\/\/evaluationshub.com\/centralizing-supplier-data-for-enhanced-procurement-insight\/\">centralising supplier data<\/a> pays off more than centralising supplier documents.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Collect to the strictest standard among the purposes a field serves, not to the average.<\/strong> If three regimes want the same fact and one of them needs it verified, collect it verified once. Collecting the self-declared version first and the verified version later means you have run two campaigns, spent two lots of supplier goodwill, and still only have one usable answer.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The reuse ratio: how to decide what to build first<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">You cannot build the whole canonical set at once, and you should not try. The question is which fields to build first.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rank them by <strong>reuse ratio<\/strong>: the number of distinct purposes a single supplier question serves.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Run the exercise on paper before you run it in a system. List the regimes, frameworks, customer questionnaires and internal processes that currently generate supplier data requests in your organisation. Include the unglamorous ones: the <a href=\"https:\/\/evaluationshub.com\/cybersecurity-questionnaires-sig-caiq-iso-27001\/\">cybersecurity questionnaires<\/a> your IT team sends, the <a href=\"https:\/\/evaluationshub.com\/kyc-kyb-in-supplier-onboarding\/\">KYC and KYB checks<\/a> in onboarding, the <a href=\"https:\/\/evaluationshub.com\/sanctions-aml-screening-ofac-eu-uk\/\">sanctions screening<\/a> refresh, quality and audit requirements, and any customer who passes their own obligations down to you.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Then list the actual questions each one generates, and count the overlaps.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In most manufacturing supply bases the top of that ranking is predictable, and it is not what people expect. The highest reuse ratios sit on structural facts rather than on sustainability content:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n\n<li>The list of manufacturing sites, with addresses and a stable identifier<\/li>\n\n\n<li>Which sites make which parts, with the dates those assignments were valid<\/li>\n\n\n<li>Legal entity identity and ownership, which feeds screening, tax and due diligence alike<\/li>\n\n\n<li>Named contacts by role, which determines whether any of the above can be refreshed at all<\/li>\n\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Those four carry almost every regime on the list. Emissions data, labour policy detail and certification evidence sit lower, because each tends to serve one or two purposes and needs refreshing on its own clock.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That ranking is worth publishing internally, because it settles an argument that otherwise recurs annually. The team that wants a hundred-question sustainability form is not wrong about needing the answers. They are wrong about the order.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The caps are a design brief, not an obstacle<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">It is tempting to read the value chain cap and the CSDDD necessity test as restrictions on doing your job. They read better as free segmentation advice from the legislator.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Between them, the two rules say something quite precise: <strong>ask small partners less, ask them only what you cannot get elsewhere, and concentrate depth where the impact actually is.<\/strong> Under the final Omnibus I outcome, CSDDD information requests are restricted to what is necessary, with extra safeguards for partners employing fewer than 5,000 people, and companies are pointed towards requesting information from the partner where impacts are most likely to occur.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is <a href=\"https:\/\/evaluationshub.com\/risk-based-supplier-segmentation-a-strategic-approach\/\">risk-based supplier segmentation<\/a>, written into law. If your programme already segments, the caps mostly describe what you do anyway. If it does not, the caps are a reason to start, and <a href=\"https:\/\/evaluationshub.com\/supplier-segmentation-models-strategic-and-risk-based-tiers\/\">segmentation models<\/a> are a good place to begin.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The practical shape this takes is three tiers of request rather than one:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A short universal set.<\/strong> Sites, parts, entity identity, contacts. Asked of everyone, kept current, small enough that a supplier with twelve employees can complete it without help. This is the set with the highest reuse ratio, so it earns its place everywhere.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A deeper set for the suppliers where impact concentrates.<\/strong> Emissions at installation level, labour and working conditions, verified evidence. Asked of a defined, justified subset, with the reason stated in the request.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A responsive set, held ready rather than collected.<\/strong> For the Forced Labour Regulation there is nothing routine to file, so the goal is not a dataset, it is the ability to answer a product-shaped question quickly. What you need is the linkage, not another form.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Note that none of the caps stop you <em>asking<\/em>. They stop you <em>requiring<\/em>. A supplier can still volunteer more, and many will, particularly when the request explains what it is for and what they get back. That is worth knowing, because the request itself is where most programmes lose their data, long before any legal limit applies. The mechanics of that are covered in <a href=\"https:\/\/evaluationshub.com\/automated-follow-up-for-supplier-evaluation-and-risk\/\">automated follow-up for supplier evaluation and risk<\/a> and in how you design a <a href=\"https:\/\/evaluationshub.com\/supplier-portal\/\">supplier portal<\/a> that suppliers will actually log into.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Making one request do the work of four<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The reuse ratio tells you what to collect. The next question is how to ask for it once.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Four moves, in the order they tend to pay off.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Consolidate the calendar before you consolidate the form.<\/strong> The first win is not a better questionnaire, it is knowing that four teams were about to contact the same supplier in the same month. A shared view of who is asking whom, and when, removes the most visible symptom immediately and costs nothing but coordination. This is the everyday version of <a href=\"https:\/\/evaluationshub.com\/cross-department-collaboration-for-supplier-evaluation\/\">cross-department collaboration on supplier evaluation<\/a>, and it is usually the point at which <a href=\"https:\/\/evaluationshub.com\/reducing-evaluation-fatigue-in-procurement-teams\/\">evaluation fatigue<\/a> starts to fall.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Make the supplier&#8217;s answer persistent, not transactional.<\/strong> If each request produces a document that lands in an inbox, nothing accumulates and the next campaign starts from zero. If it updates a record the supplier can see and correct, the second request is shorter than the first and the fourth is almost empty. This is the structural difference between <a href=\"https:\/\/evaluationshub.com\/replace-spreadsheets-supplier-management\/\">running the programme on spreadsheets and running it on a system<\/a>, and it is the reason the effort curve bends downward rather than upward.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Give something back with every request.<\/strong> The strongest lever available is data you already own. A supplier who receives their <a href=\"https:\/\/evaluationshub.com\/supplier-scorecards\/\">scorecard<\/a> alongside the request is being asked for a contribution to a conversation rather than for homework. The same applies to sharing what their data was used for afterwards.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Keep the trail as you go, not afterwards.<\/strong> Who asked, for what purpose, when, what was answered, what evidence was attached, and what changed since. Assembled at the time this is nearly free. Reconstructed under an <a href=\"https:\/\/evaluationshub.com\/digital-supplier-audits-remote-compliance\/\">audit<\/a> or an authority&#8217;s request it is expensive and incomplete, which is why a <a href=\"https:\/\/evaluationshub.com\/reporting-audit-trail\/\">reporting and audit trail<\/a> belongs in the design rather than in the remediation plan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where an answer comes back incomplete or an evidence gap opens, that belongs in the same loop as any other finding, through <a href=\"https:\/\/evaluationshub.com\/supplier-capa-corrective-actions\/\">corrective actions<\/a> rather than through a separate chase list.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Where to start if you are starting today<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">If the map above is new to your team, the cheapest useful first step is not a system change. It is a single page listing every supplier data request your organisation made in the last twelve months, who sent it, and what it was for.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Most teams doing this for the first time find the same three things: the same supplier contacted more times than anyone realised, several questions asked in more than one form with slightly different wording, and at least one regime whose data nobody currently owns.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That page is the start of your mapping table. Everything else in this article is a way of filling it in.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">From there, the sequence that tends to work is to build the universal set first because it has the highest reuse ratio, wire it into <a href=\"https:\/\/evaluationshub.com\/supplier-onboarding\/\">supplier onboarding<\/a> so new suppliers arrive with it complete, and then backfill the existing base in priority order rather than all at once. Teams that have taken a programme from a handful of suppliers to a few hundred usually describe <a href=\"https:\/\/evaluationshub.com\/scale-spm-programme-10-to-500-suppliers\/\">scaling in waves<\/a> rather than in one campaign, and the same applies here.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you want to prove the approach before committing to it, a <a href=\"https:\/\/evaluationshub.com\/supplier-performance-pilot\/\">supplier performance pilot<\/a> on a single category is enough to show whether the second request really is shorter than the first.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The point<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The regimes are not going to stop arriving, and they are not going to converge on a common format. That part is outside anyone&#8217;s control.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What is inside your control is whether each new one lands as a fresh collection campaign or as a mapping exercise against data you already hold.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The difference between those two outcomes is not budget and it is not software. It is a decision made early about what a supplier data point is: not an answer sitting in a form, but a fact with an owner, a date, an evidence standard and a recorded purpose. Build it that way and the fifth regime costs a fraction of the first.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask once, report many times, and let the supplier notice the difference.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently asked questions<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Does the CSRD value chain cap mean we cannot ask small suppliers for detailed sustainability data at all?<\/strong><br\/>\nNo. The cap limits what you can <em>require<\/em> from suppliers with 1,000 employees or fewer for the purpose of CSRD reporting, setting the ceiling at the content of the voluntary reporting standard. You can still ask beyond it, provided you make clear that the request goes beyond the cap and that the supplier may decline. The Commission&#8217;s own explanation also notes the cap applies only to CSRD reporting purposes and does not affect requests made for other purposes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>If EUDR is not capped, can we ask EUDR questions of everyone?<\/strong><br\/>\nThe absence of a size-based cap reflects that the data is a condition of placing goods on the market rather than a reporting burden to be shared. In practice you need it from the suppliers whose commodities are in scope, and asking it of suppliers outside scope adds effort without adding an answer you need. Scope by product, not by supplier size.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Which single field should we build first?<\/strong><br\/>\nThe manufacturing site list, with a stable identifier and the dated link between sites and the parts they make. It has the highest reuse ratio of anything you will collect, it converts downward into country of origin whenever a looser requirement needs one, and it is the only thing that lets you answer a product-shaped question quickly.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>How often should this data be refreshed?<\/strong><br\/>\nIt depends on the field rather than on the supplier. Structural facts such as sites and entity identity change rarely and should be refreshed on an event basis, when the supplier tells you something has changed or when a signal suggests it has. Consignment-level data refreshes per shipment. Treating all supplier data on a single annual clock is what makes programmes feel heavy. There is more on separating those rhythms in the approach of moving from <a href=\"https:\/\/evaluationshub.com\/annual-reviews-to-continuous-supplier-monitoring\/\">annual reviews to continuous supplier monitoring<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>We operate across several countries and languages. Does that change the approach?<\/strong><br\/>\nIt raises the value of it. The duplication problem multiplies when each entity runs its own requests, and a shared canonical set is the only practical way to avoid contacting the same supplier from three subsidiaries in three languages. See <a href=\"https:\/\/evaluationshub.com\/multi-entity-multi-language-supplier-onboarding\/\">multi-entity and multi-language supplier onboarding<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Is this a compliance project or a procurement project?<\/strong><br\/>\nProcurement owns the relationship and the request, so procurement owns the data. Compliance and sustainability own the interpretation of what each regime needs from it. Splitting it the other way tends to produce a dataset that satisfies reports and cannot answer an operational question.<\/p>\n","protected":false,"gt_translate_keys":[{"key":"rendered","format":"html"}]},"excerpt":{"rendered":"<p>Start with one question Here is a question your team already asks suppliers: where was this made? Seven words. One field in a form. It looks like the easiest thing you will collect all year. Now watch what happens when four different colleagues ask it in the same quarter. The sustainability team asks it because [&hellip;]<\/p>\n","protected":false,"gt_translate_keys":[{"key":"rendered","format":"html"}]},"author":5,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_templately_pack_id":"","_templately_imported_at":"","_templately_source":"","_templately_import_session_id":"","wds_primary_category":418,"footnotes":""},"categories":[418],"tags":[],"class_list":["post-26717","post","type-post","status-publish","format-standard","hentry","category-supplier-risk-management"],"acf":[],"gt_translate_keys":[{"key":"link","format":"url"}],"_links":{"self":[{"href":"https:\/\/evaluationshub.com\/api-v1\/wp\/v2\/posts\/26717","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/evaluationshub.com\/api-v1\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/evaluationshub.com\/api-v1\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/evaluationshub.com\/api-v1\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/evaluationshub.com\/api-v1\/wp\/v2\/comments?post=26717"}],"version-history":[{"count":0,"href":"https:\/\/evaluationshub.com\/api-v1\/wp\/v2\/posts\/26717\/revisions"}],"wp:attachment":[{"href":"https:\/\/evaluationshub.com\/api-v1\/wp\/v2\/media?parent=26717"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/evaluationshub.com\/api-v1\/wp\/v2\/categories?post=26717"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/evaluationshub.com\/api-v1\/wp\/v2\/tags?post=26717"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}